CASE STUDY 09 / 16 · AUTOMATIONSOURCE-GROUNDED IMPLEMENTATION RECORD

DOWstream Control Tower.

An end-to-end control tower for an import freight lane from Saudi Arabia to the UAE. Automations handle the handoffs, and every milestone lands in one database.

VIEW THE SYSTEM DESIGN
DOCUMENTED DELIVERY STAGERunning, v3.5

Uses daily extracts, not a continuous live source feed. Glyph customs document extraction remains in build; clearance approval remains with people.

CORE OPERATIONAL PROBLEMOne import shipment passes through document intake, job opening, vessel tracking, delivery orders, customs and pre-alerts, spread across mail, portals, the ERP and spreadsheets.
MY CONTRIBUTIONMapped the KSA–UAE import journey, built automation handoffs and the shared milestone data model powering the control tower.
TECHNOLOGY STACKPython / SQLite / Power Automate / Power Automate Desktop / Qlik / SharePoint
01 / THE CHANGE

BEFORE
& AFTER.

01 — BEFORE

The manual / previous workflow

Mail, origin and destination extracts, ERP jobs, carrier portals and customs steps are managed in separate tools with repeated handoffs.

02 — AFTER / TARGET

What changed

Running v3.5: Power Automate, desktop flows and Python coordinate documentation and delivery-order steps and write shipment milestones to SQLite.

IMPLEMENTATION BOUNDARY Uses daily extracts, not a continuous live source feed. Glyph customs document extraction remains in build; clearance approval remains with people.

02 / SYSTEM DESIGN

UNDER
THE HOOD.

Built from source-described project workflows. Arrows retain execution and data dependencies.

SYSTEM ARCHITECTUREDOWstream Control Tower / PROCESS GRAPH
↓ SVG
PROCESS / STORE AGENT HUMAN APPROVAL NOT YET COMPLETE

Follow the workflow

STEPS / 12
  1. 01

    Commercial documents arrive by mail

    Scanned documents from the documentation team.

  2. 02

    Daily origin and destination extracts

    Two CSV extracts, matched on the purchase order.

  3. 03

    Bill of lading arrives

    Sent by the documentation team.

  4. 04

    Power Automate files them in SharePoint

    Saved to the job folder with the naming convention.

  5. 05

    Python opens the matching job in the ERP

    New jobs at origin are mirrored at destination with their custom fields.

  6. 06

    Desktop flow builds the delivery order request

    One request letter per bill of lading, by carrier.

  7. 07

    Glyph extracts data for customs

    Commercial documents, delivery order and bill of lading go into one template. In build.

  8. 08

    SQLite: one row per shipment, one per container

    Every automation writes its milestone here.

  9. 09

    Python submits and downloads the delivery order

    Robotic steps on the port community portal.

  10. 10

    Pre-customs pack to the clearance team

    Documents and data mailed with a standard subject.

  11. 11

    Control tower dashboard

    Live and completed shipments. The digital twin reads the same data.

  12. 12

    Pre-alert to the client

    Invoice, delivery order and bill of lading combined and mailed.

03 / ENGINEERING

WHY THIS
DESIGN.

DESIGN DECISION

Technology with a specific job.

Store per-shipment and per-container milestones once, so dashboard visibility and the digital twin use the same operational facts.

TOOLS IN CONTEXT
PythonSQLitePower AutomatePower Automate DesktopQlikSharePoint

System integrations and capabilities follow the maturity statement above; the diagram is not proof that every stage is deployed.

04 / THE EVIDENCE

IMPACT,
WITHOUT
GUESSWORK.

DOCUMENTED EVIDENCE

v3.5 running with daily extracts and delivery-order automation. No project-specific AED or labour-saving figure documented.

REALIZED AED CASH SAVINGSAWAITING MEASUREMENTNo project-specific realized AED figure supplied.
THE NEXT MEASURE

Operator minutes per delivery-order request, plus exceptions per 100 shipments.

RECORDS NEEDED TO VERIFY

Matched pre/post operator time per delivery order and carrier, shipment counts, exception rate, overtime payroll, licence/support costs.

Capacity released, avoided future expenditure and actual cash reductions are distinct. Do not allocate the portfolio-wide 20+ hours/week or 22% result to this individual case without supporting measurement.

OPEN THE AED SCENARIO CALCULATOR
05 / CONNECTED WORK

THE SYSTEM
IS CONNECTED.