CASE STUDY 11 / 16 · ANALYTICS & PROCESSSOURCE-GROUNDED IMPLEMENTATION RECORD

DOWstream Digital Twin.

A 3D digital twin of the import lane from Saudi Arabia to the UAE. Each shipment appears at its current step, from loading at origin to gate-out at destination, with vessels plotted at sea.

VIEW THE SYSTEM DESIGN
DOCUMENTED DELIVERY STAGERunning, v3.5

Runs from daily extracts. Vessel positions are estimates; a graphical marker is not a measured real-time vessel coordinate.

CORE OPERATIONAL PROBLEMMilestone tables say where one shipment is. They don’t show the whole lane at a glance: how many containers are at the port, which vessels are close to arrival, and where documents are stuck.
MY CONTRIBUTIONDesigned the model that translates milestone records into a spatial shipment narrative and a drillable operations display.
TECHNOLOGY STACK3D rendering / Node.js dashboard / Python bridge API / SQLite / Sea-route maths
01 / THE CHANGE

BEFORE
& AFTER.

01 — BEFORE

The manual / previous workflow

Shipment milestone tables tell operators individual statuses but make lane-wide congestion and document bottlenecks harder to see.

02 — AFTER / TARGET

What changed

Running v3.5: a visual lane and world view read the shared SQLite milestones and place vessels on calculated routes.

IMPLEMENTATION BOUNDARY Runs from daily extracts. Vessel positions are estimates; a graphical marker is not a measured real-time vessel coordinate.

02 / SYSTEM DESIGN

UNDER
THE HOOD.

Built from source-described project workflows. Arrows retain execution and data dependencies.

SYSTEM ARCHITECTUREDOWstream Digital Twin / PROCESS GRAPH
↓ SVG
Flow n_data->n_db n_events->n_db n_db->n_bridge n_bridge->n_stage n_bridge->n_pos n_stage->n_scope n_pos->n_scope n_scope->n_gulf n_scope->n_world n_gulf->n_twin n_world->n_twin n_data Daily origin and destination extracts n_events Automation milestones n_db SQLite milestone database n_bridge Local bridge API n_stage Place each shipment at its current step n_pos Calculate each vessel’s position n_scope Viewer picks the scope n_gulf Gulf view n_world World view n_twin Interactive 3D twin
PROCESS / STORE AGENT HUMAN APPROVAL NOT YET COMPLETE

Follow the workflow

STEPS / 09
  1. 01

    Daily origin and destination extracts

    The newest file of each is imported automatically.

  2. 02

    Automation milestones

    Delivery orders, customs, payments and invoice posting, written by each automation.

  3. 03

    SQLite milestone database

    One row per shipment and one per container, keyed on the origin reference.

  4. 04

    Local bridge API

    Serves shipments, milestones and status to the dashboard.

  5. 05

    Place each shipment at its current step

    Loaded, customs, gate-in, on vessel, arrived, unloaded, cleared, gate-out.

  6. 06

    Calculate each vessel’s position

    Along the sea route from departure date and ETA, with distance in nautical miles.

  7. 07

    Gulf view

    Ports, terminals, gates, trucks, and the UAE documentation and automation offices side by side.

  8. 08

    World view

    Rest-of-world vessels followed to their destination ports.

  9. 09

    Interactive 3D twin

    Drag to rotate and tilt, or switch to move around the lane.

03 / ENGINEERING

WHY THIS
DESIGN.

DESIGN DECISION

Technology with a specific job.

Reuse the control tower’s SQLite facts. Vessel position is calculated from departure, ETA and sea distance—not verified AIS/GPS position.

TOOLS IN CONTEXT
3D renderingNode.js dashboardPython bridge APISQLiteSea-route maths

System integrations and capabilities follow the maturity statement above; the diagram is not proof that every stage is deployed.

04 / THE EVIDENCE

IMPACT,
WITHOUT
GUESSWORK.

DOCUMENTED EVIDENCE

v3.5 digital twin operating, linked to daily extracts and shared milestone store. No measured reduction in exception-finding time.

REALIZED AED CASH SAVINGSAWAITING MEASUREMENTNo project-specific realized AED figure supplied.
THE NEXT MEASURE

Minutes to identify shipments stuck at a milestone against the existing milestone table.

RECORDS NEEDED TO VERIFY

Timed exception-search tasks, ground truth milestone logs, position estimate tolerance, daily snapshot coverage and operator usage.

Capacity released, avoided future expenditure and actual cash reductions are distinct. Do not allocate the portfolio-wide 20+ hours/week or 22% result to this individual case without supporting measurement.

OPEN THE AED SCENARIO CALCULATOR
05 / CONNECTED WORK

THE SYSTEM
IS CONNECTED.