Multimodal Route Agent.
Pick an origin and a destination. An agent searches carrier schedules across sea, air, rail and truck and returns the best route first.
VIEW THE SYSTEM DESIGNConcept only. Live carrier schedule feeds and customs-rule verification are not demonstrated.
BEFORE
& AFTER.
The manual / previous workflow
Planners manually compare ocean, air, road and rail schedules, then validate cross-border rules for every leg.
What changed
Proposed: generate candidate routes, retrieve carrier schedules, verify customs requirements and rank feasible paths.
IMPLEMENTATION BOUNDARY Concept only. Live carrier schedule feeds and customs-rule verification are not demonstrated.
UNDER
THE HOOD.
Built from source-described project workflows. Arrows retain execution and data dependencies.
Follow the workflow
STEPS / 08- 01
Origin and destination
Chosen by the user.
- 02
Agent plans candidate routes
Combines modes: sea, air, rail and truck.
- 03
Sea carrier schedules
Searched carrier by carrier.
- 04
Air schedules
Flight options between the hubs.
- 05
Rail and truck legs
First and last mile, and overland corridors.
- 06
Customs rules by country
Regulations for each country on the route.
- 07
Rank the options
Best route first. Cost is added later, when rate data is available.
- 08
Best route, then alternatives
The optimum route first, with the other options after it.
WHY THIS
DESIGN.
Technology with a specific job.
Prioritize operational feasibility before price ranking: trustworthy, comparable freight rates are not yet available.
System integrations and capabilities follow the maturity statement above; the diagram is not proof that every stage is deployed.
IMPACT,
WITHOUT
GUESSWORK.
Workflow and architecture concept; no simulated output is presented as a dispatch-ready route.
Planner minutes per feasible route for a fixed origin, destination and departure window.
A benchmark of origins/destinations, schedule snapshots, route feasibility reviews, planner times and exception records.
Capacity released, avoided future expenditure and actual cash reductions are distinct. Do not allocate the portfolio-wide 20+ hours/week or 22% result to this individual case without supporting measurement.
OPEN THE AED SCENARIO CALCULATOR